Production Quality Management

City Based Hot Melt Quality Control Plan: Istanbul, Ankara, Izmir and Kocaeli Application

Measurement matrix that gathers hot melt quality control in different city operations in a single framework, regional risk differences and an applicable daily control flow.

Preparer Koçak Endüstri Teknik Danışmanlık Ekibi Update 31.07.2026 Reading Approximately 4 min.
60 saniyede hızlı teknik yanıt

City Based Hot Melt Quality Control Plan: Istanbul, Ankara, Izmir and Kocaeli Application

Instead of managing city-based quality differences one by one, put the daily control card in a common framework. When temperature, nozzle sound, consumption and on hold are monitored in the same way, the same intervention logic is maintained for Istanbul, Ankara, Izmir and Kocaeli.

The main challenge of a team working not in a single city but in different operation centers is to maintain the quality standard at the same level. Different deviations may occur in the same product due to humidity fluctuations in Istanbul, shift tempo in Ankara, campaign pressure in Izmir or product transition frequency in Kocaeli.

Why do we separate the risk map by region?

The first step is to remove the assumption that “the same product behaves the same in every city”:

  • Istanbul: Visual acceptance and process stability may oscillate more frequently due to humidity and intense shift transitions.
  • Ankara: Temperature-time deviations may occur collectively during equipment and shift transitions.
  • İzmir: Speed pressure significantly affects the consumption trend during campaign periods.
  • Kocaeli: If the product switching frequency is high, initial verification should be repeated more frequently.

9 fields of common quality card

AreaRecommended frequencyWhy is it important?Related action
Product codeAt the beginning of each shiftCorrect recipe and targetReduce the risk of wrong product to zero
Temperature verification15 minute periodKeeps nozzle behavior stableReturn to target range
Consumption curveEvery 30 minutesMakes efficiency fluctuation visibleUpdate rate plan if necessary
Open holdEvery 5 minutesIt affects speed decisionIt is recorded in the field note
Filter / feedWhen changing productReduces risk of cloggingCompare first controlled situation
Visual acceptanceFirst 10 pieces + 10 min tourCatches early defectMini correction tour
Shift recordingAt each interventionInternal audit qualitySummary note and impact tracking
Product intervention reasonAfter each interventionMakes the recurring cause visibleUpdate the effect map again
Product comparison linkDiaryAccurate technical referenceGo to the relevant product page

The decision is more reliable when the control process works in conjunction with product technical manuals:

Mini closing note at the end of the day

One suggestion for the shift leader: write down the “why”, “where”, “when” and “which product” fields together. Without these fields, the risk of making wrong decisions in city comparisons increases.

Regional FAQ

Region-specific decisions are accelerated with a short answer set:

  • Which indicator should be looked at in Istanbul? First, consumption trend + open waiting are monitored together.
  • What is the immediate step for Ankara? At the first deviation, verify the temperature and nozzle line instead of waiting for the city difference.
  • What changes during the campaign period in Izmir? Manage the short interventions triggered by the speed increase with a "15-minute mini tour".
  • At what point in the Kocaeli line should records be kept the most? Product passage, filter control and consumption should be kept together.
Frequently asked questions

City Based Hot Melt Quality Control Plan: Istanbul, Ankara, Izmir and Kocaeli Application hakkında merak edilenler

Can the same control template be used for Istanbul and Ankara?

It can be used, but application frequency and alarm thresholds should be differentiated according to city operation.

How many minutes of temperature verification is enough?

A period of at least 15 minutes is recommended, and additional verification is recommended before each change in critical product transitions.

How to make regional comparison?

Compare 3 main metrics by region on the same day: temperature deviation, open dwell time, and consumption deviation.

What is recorded after product replacement?

The old batch, new batch, control measurements and the mini correction step taken are kept in a single record.

What is the common risk for Kocaeli and Gaziantep?

Visual decision alone is insufficient in the first hours after the product transition; When measurement and recording are not kept together, there is a risk of incorrect intervention.

Which measurement in this model provides quick decisions?

Consumption, on standby and temperature data falling on the same day in the common template provides the fastest comparison.

Technical resources and verification

The content has been prepared in Turkish with the technical experience of Koçak Endüstri, based on the following manufacturer resources.

Let's choose the right adhesive for your application together

You can get technical guidance and offers for Jowat products by sharing your machine, material and consumption information.

Get a technical quote
A KOÇAK GROUP COMPANY

Koçak Endüstri operates with the strength of Koçak Group.

We reinforce our industrial supply and technical solution capabilities with Koçak Group’s corporate experience, quality approach and sustainable growth vision.

Discover Koçak Group groupkocak.com.tr